Newer posts are loading.
You are at the newest post.
Click here to check if anything new just came in.

July 17 2009

22:03
7 Days, Day 7: FOs Spiral Shawl and 7 Days
In knitterly circles, FO = Finished Object. I finished a shawl and another installment of 7 days, so this photo does double duty (I think I already did that for my Day 2, too).

Bye for now, everyone! See you next time!
22:03
Spiral Shawl
In action. I need a wall that isn't white.
22:02
Blocking the ...shawl or tablecloth. Whichever.
So it's not big enough to be a tablecloth unless I use it like this, with string running through all the loops on the edge and cinched. I don't like how this looks, so that brings us back to 'it's not big enough to be a tablecloth'. Maybe someone I know has a smaller table. I still like it, though.
22:01
I'm still digging Girasole
Jared Flood writes a dang good pattern :)

July 14 2009

22:46
She thought her modeling days were over
Girasole! And Packet!

December 13 2008

17:15
Hemlock Ring Doily
Completely finished, ready for gifting.
17:15
Hemlock Ring Doily...and Packet
03:48
I made a lace thing that's not a sock!
I'm so proud of me.
03:48
Looking Hemlockier
Before The Dance of the Thousand Pins
03:47
I knitted a marine beast
The Hemlock Ring takes a dunk before blocking.

September 03 2008

16:43
Rainy Day short row heels
Loosely based on the Magknits pattern. Mods: toe-up, 2 at once, short row heels, twisted rib cuff, sewn cast-off.
16:42
Rainy day socks, kinda
Very quick and easy, especially because I didn't follow the posted recipe. I made these two-at-once, toe-up, with magic loop on size 3mm needles. Oh, and short-row heels instead of flap and gusset. I didn't do the picot bind-off, either, just twisted rib.
Older posts are this way If this message doesn't go away, click anywhere on the page to continue loading posts.
Could not load more posts
Maybe Soup is currently being updated? I'll try again automatically in a few seconds...
Just a second, loading more posts...
You've reached the end.